High Line Division S.L. carried out the Leaning Poles Realignment & Guy Wires Maintenance of 69 kV Overhead Transmission Lines & 13,8 kV Overhead Distribution System of Petromasila Networks at Masila-CPF Facilities in the territory of Yemen.
Project was performed completely in Live Line with NO power interruption.
For the purpose of Leaning Poles realignment was required the installation of brand new guy wires and excavation and civil works at extremely stony soil.
Once Guy Wire anchorage assembly was installed and aligned we proceed with the backfilling and compaction of the soil.
Then we proceed with the installation of Guy Wires Pole Assembly & Anchorage attachment.
To finalize we proceed with the Pole realignment, last backfilling & soil compacting works, the job is done.
Project includes integral maintenance of almost 1,000 Guy Wires belongs to 860 Poles of 69 kV Transmission lines (403 Poles)and 13.8 kV Distribution System (457 Poles)completed in Forty Six days (46).
Project was completed achieving all established objectives related to Quality, Safety and Environment Protection, and as usual in high Line Division exceeding Client expectations as shown the Completion Certificate provided by Petromasila.